It takes up minimal space in the utility room and contains the necessary components.
Our installations can be found in many buildings across the Czechia and in other countries of Europe.
OUR COMPANY
Information on quality and environmental policy through the sale of quality products.
CAREER
What career can await you with us and what positions are currently available in our company?
Information line
Mon-Fri: 7:00 am-3:00 pm
Our friendly team is available for all of your suggestions and questions.
Service line
Mon-Fri: 7:00 am-5:00 pm
Weekends: 8:00 am-12:00 pm
Do you need service or a service inspection?
Design support
Mon-Fri: 7:00 am-3:00 pm
Planning, design, installation and commissioning. Quality support with our specialists.
It takes up minimal space in the utility room and contains the necessary components.
Our installations can be found in many buildings across the Czechia and in other countries of Europe.
OUR COMPANY
Information on quality and environmental policy through the sale of quality products.
CAREER
What career can await you with us and what positions are currently available in our company?
Information line
Mon-Fri: 7:00 am-3:00 pm
Our friendly team is available for all of your suggestions and questions.
Service line
Mon-Fri: 7:00 am-5:00 pm
Weekends: 8:00 am-12:00 pm
Do you need service or a service inspection?
Design support
Mon-Fri: 7:00 am-3:00 pm
Planning, design, installation and commissioning. Quality support with our specialists.
Air-to-water heat pump HP3AW30SB heats the new multifunctional building Sport centre Zlín. The realization was carried out in cooperation with the construction company according to the design of the academic sculptor Luďko del Maschio.
The building serves as a sports and relaxation centre with a focus on physical activities and yoga. On the ground floor, a relaxed café is already in operation in a beautiful interior with large windows. The upper floors of the building will be private with several apartments.
Heat pump SPLIT HP3AW 30 SB |
|
System | AIR-WATER |
Accessories | storage tank 500 l storage tank Tev 1000 l back-up electric boiler 24 kW |
Usage | heating, hot water heating |
Place of realization | Mladcová, Zlín Region |
Year of installation | 2019 |
Thermal loss | 45 kW |
Heating system | low-temperature combined |
Are you interested in this realization?
If you are interested in any of our products or services, please do not hesitate to contact us.